Kitchen and bathroom remodeling across North America, measured and quoted in writing.
A full kitchen, a dated bathroom, new cabinets or countertops, or a tub you want turned into a walk-in shower? Tell us about the room and a remodeling specialist who works in your area will visit, measure and give you a written quote.
- FreeQuote requests
- 8Kitchen and bath services
- Canada& United States

The quote looked fine. Then came the change orders.
A vague quote leaves room for surprises: allowances set too low, a permit nobody mentioned, a rotten subfloor under the old tub, countertops that do not fit because the cabinets were never levelled. The budget grows one change order at a time.
Measure first. Put every line in writing.
Every request starts with a visit: measurements, plumbing and wiring locations, ventilation, floors and access. The written quote lists the full scope, the allowances for finishes not yet chosen, the permits and the schedule.
Request a remodeling quote →Eight Kitchen and Bath Services
From a new countertop to a tub-to-shower conversion to a full kitchen gutted to the studs, every project starts the same way: a visit, measurements and a written scope.
Kitchen Remodeling
Full or partial kitchen renovations: layout, cabinets, countertops, backsplash, lighting and flooring.
Bathroom Remodeling
Full bathroom renovations: plumbing, waterproofing, tile, vanity, toilet, shower or tub, lighting and ventilation.
Kitchen Cabinets
New cabinet installation, plus refacing or refinishing when the existing boxes are still sound.
Countertops
Quartz, granite, solid surface and laminate countertops, measured, cut and installed.
Tub-to-Shower Conversion
Old bathtub removed and replaced with a walk-in shower with a low threshold, glass and grab bars if wanted.
Custom Tile Showers
Tiled walk-in showers with a waterproofing membrane, niches, benches and glass enclosures.
Vanities & Fixtures
New vanities, sinks, faucets, toilets, mirrors and lighting, installed and connected.
Accessible Bathroom Upgrades
Curbless showers, grab bars, comfort-height toilets, handheld showers and wider doorways.
What These Jobs Involve
Setting a quartz countertop
Tiling a shower wall
Walk-in shower where a tub used to be
Adjusting new cabinet doors
Connecting a new bathroom vanity
Finished kitchen remodelSix Principles Behind Every Lustral Quote
Measured First
No price from a guess. The space is measured and the plumbing, wiring and ventilation are checked before anything is quoted.
Behind the Walls
Water damage, old wiring and soft subfloors are common in kitchens and bathrooms. The quote says how surprises are handled and priced.
The Right Specialist
Cabinet installs, countertop fabrication, tile showers and full remodels are different kinds of work. Requests go to people who do that specific job.
Houses and Condos
Houses, condos, plexes and rental units, with building rules and access planned in for condo work.
One Form to Start
Describe the project once, on your schedule. No phone tag just to get started.
Canada and US
Requests welcome across major metros and surrounding areas, in English or French.
Five Steps, Every Project.
Request
You describe the room, what is wrong with it now and what you want, in the quote form.
Visit
A local specialist measures the space and checks plumbing, wiring, ventilation, floors and access.
Design
Layout, materials and finishes are settled, with options at different price points where they make sense.
Quote
Written quote with the full scope, allowances, permits, schedule and payment terms.
Build
Work done to the agreed scope, then a final walkthrough with you to check every detail.
Four Levels of Kitchen and Bath Remodel
Knowing which level you are at makes quotes easier to compare. Timelines are rough and depend on lead times for cabinets and stone.
Paint, hardware, a faucet, lighting, a new vanity or a countertop swap. Layout and plumbing stay where they are.
New or refaced cabinets, countertops and backsplash, or a tub-to-shower conversion. Most walls and plumbing stay.
Gutted to the studs, plumbing and wiring updated where needed, everything new in the same layout.
Moving walls, the sink, the toilet or the range. Usually needs permits and sometimes an engineer.
Six Things Every Remodeling Quote Should Include
Full Scope
Demolition, plumbing, electrical, drywall, tile, cabinets, countertops, fixtures and cleanup, each listed.
Allowances
For finishes not yet chosen, a clear allowance for each one, so you know what changes if you pick something pricier.
Waterproofing Method
For showers and tub surrounds, how the wet areas are waterproofed behind the tile.
Permits and Approvals
Which permits are needed, who pulls them, and any condo board approvals.
Schedule and Lead Times
Start date, how long each room is out of use, and lead times for cabinets and countertops.
Warranty Terms
Ask what the workmanship warranty covers and for how long, and get it in writing along with the manufacturer warranties.
What Kitchen and Bath Projects Involve
Every room is different, so every price is different. These are common requests, what they involve and what moves the cost.
Demolition, plumbing and electrical updates, drywall, new cabinets, countertops, backsplash, flooring, lighting and appliance hookup.
Layout changes, cabinet line and finish, countertop material, appliances, flooring, and what is found behind the walls.
Tub removal, drain changes, a low-threshold shower base, waterproofed walls with tile or panels, glass, valve and trim.
Base type, tile versus panels, glass style, valve replacement, grab bars, and any subfloor or wall repairs.
Gutted to the studs, new supply and drain lines as needed, waterproofing, tile, vanity, toilet, shower or tub, lighting and fan.
Room size, fixture choices, amount of tile, moving plumbing, ventilation upgrades and condo building rules.
Homeowners, Condo Owners and Small Landlords
Homeowners and condo owners
Kitchens and bathrooms in houses and condos, from a single upgrade to a full remodel, planned around the fact that you still live there.
- Visit and measurements first
- Allowances and permits in writing
- Condo building rules planned in
- One upgrade or a full remodel
Small landlords and investors
Rental units and plexes where kitchens and bathrooms need to look good, stand up to tenants and be finished between leases.
- Durable mid-range finishes
- Work timed between tenants
- Several units through one form
- Clear scope for each unit
Canada and the United States.
Plus 294 more cities across Canada and the US. See all service areas →
Frequently Asked Questions
How much does a kitchen or bathroom remodel cost?
It depends far more on scope than on square footage. Keeping the layout and replacing finishes costs much less than moving plumbing, walls or windows. Cabinet line, countertop material, tile, fixtures, appliances and what is found behind the walls all move the price. The only reliable number is a written quote after a visit.
How long does a remodel take?
A tub-to-shower conversion or a countertop replacement is usually a matter of days. A full bathroom usually takes a few weeks, and a full kitchen longer. Custom cabinets and stone countertops have their own lead times, so ordering is planned before demolition starts.
Can I keep using the kitchen or bathroom during the work?
Usually not the room being remodeled. For a kitchen, a temporary setup with the fridge and a microwave elsewhere in the house helps. If the home has only one bathroom, say so in the form so the schedule keeps the time without a working toilet and shower as short as possible.
Should I reface or replace my cabinets?
If the cabinet boxes are solid and the layout works, refacing or refinishing gives a new look for less money and less disruption. If the boxes are damaged, the layout does not work, or you want different sizes and storage, replacement makes more sense.
Quartz or granite?
Both are durable and suit kitchens and bathrooms. Quartz is engineered, consistent in colour and does not need sealing. Granite is natural stone, every slab is different, and it should be resealed from time to time. Prices overlap, so the choice usually comes down to look and upkeep.
Can a bathtub be replaced with a walk-in shower?
Yes, in most bathrooms. The tub comes out, the drain is adapted, and a low-threshold or curbless shower base goes in with waterproofed walls, tile or panels, and glass. If it is the only tub in the house, think about resale and young children before removing it.
Do I need a permit?
Often when plumbing is moved, walls are changed or new electrical circuits are added. Condo buildings may also have their own approval process even for like-for-like work. A proper quote should say which permits and approvals are needed and who takes care of them.
How do I get a quote?
Fill out the quote form with your city, the room and what you want done. Rough measurements and the age of the current kitchen or bathroom help. A specialist who works in your area follows up to arrange a visit. Requesting a quote is free and there is no obligation to go ahead.
What Every Quote Includes
Kitchens and Bathrooms, Planned Before They Are Built.
Lustral focuses on the two rooms that are hardest to renovate well: kitchens and bathrooms. Full remodels, cabinets, countertops, tile showers and tub-to-shower conversions.
Every request starts with a visit and measurements, and every quote lists the scope, the allowances and the schedule before you decide.
Learn more about Lustral →Read our blog →
Planning a Kitchen or Bathroom? Start With a Quote.
Fill out the quote form with your city and the room you want to change. A local specialist follows up to visit, measure and give you a written quote. Free to request, no obligation.